Vintun Readiness Improvement Cycle (VRIC)
In the life cycle of any system, a holistic understanding of the supply chain is integral to ensuring on-time readiness. In more complex supply chains, this becomes even more foundational as the number of organizations and touch points along the life cycle increase. Within these complex supply chains, the root cause of issues across different or multiple Integrated Product Support (IPS) elements can be difficult to bring to the surface and resolve. These challenges have led to the implementation of a multitude of Naval Aviation Enterprise (NAE) readiness initiatives to improve resiliency and efficiencies within the supply chain.
Initiatives such as the Readiness Control Board (RCB), Sustainment Program Baseline (SPB), Naval Sustainment System- Supply (NSS-S), Naval Sustainment System- Aviation (NSS-A), Naval Sustainment System- Shipyard (NSS-SY), Integrated Supply Chain Management (ISCM), and others are putting improvements to readiness at the forefront of Naval Aviation.
Phase 1: Pre-Event Planning
Work directly with our customers in all planning of the event to include:
Assistance in selection of readiness degraders/discussion topics for the event
Pre-event engagement with stakeholders across the supply chain
Management of event logistics, agenda, and slide creation
Vintun’s Unique Value Contribution
Our experts help your team through each step of the event process
Adaptable and flexible events to meet each customers need
Able to hold virtual, in-person, and hybrid events
Phase 2: Independent Data Analysis
Once the readiness degraders/discussion topics for the event are finalized, our team will:
Conduct independent data review and analysis
Correlate and structure data from each stakeholder’s organizational point of view
Compilation and summary of results for discussion during facilitated events
Vintun’s Unique Value Contribution
Rank ordering tool based on algorithm/weighted calculations
Use of analytical best practices across readiness initiatives
Our readiness initiative experts will ensure information is provided from each stakeholder organization
Independent data analysis based on data allows for removal of organizational bias
Phase 3: Event Facilitation
Total event management includes:
Total stakeholder participation across the supply chain
Data driven discussion leading to Root Cause Analysis (RCA) determination and resolution
Event notation and capture of action items
Audio/Visual management
Creation of daily and event specific summaries for leadership review tied to specific readiness initiatives
Vintun’s Unique Value Contribution
Event allows equal value for all stakeholder viewpoints
Implementation of lessons learned provided from other Events
Our team involvement allows concentrated focus from stakeholders on the discussion while we capture notes and actions from the event
Phase 4: Action Item Resolution
Set-up and facilitation of working level group meetings to burn-down actions from the events
Creation and management of Action Item Tracker
Agenda and minutes creation based on priority of actions
Provision of background information from each task
Keeps historical record of work conducted by task
Provision of tailored metrics for your organization
Vintun’s Unique Value Contribution
Disciplined and effective method for action item resolution
Custom reports based on client requirements (availability, readiness, cost, etc.)
Forum allows for continued relationship growth between stakeholders